Find Help and Relief Services

Find a service, a drop-off point, an offer, or relief work. Services can change quickly. Check the update time before you travel.

Emergency calls

Use these numbers for urgent rescue or medical help. They are not ordinary relief services.

Health help

Medical help, rescue coordination, hospital-bed information, and 24-hour mental health support.

Official source
1115Call

Latest updates

Rasuwa · Nilkantha Higher Secondary School Hostel, Uttargaya-5

Nilkantha Higher Secondary School Hostel, Uttargaya-5

OtherRelief Work Underway

Earlier informationDelivered

Generator fuel delivered to Nilkantha displacement centre

Overview

All Hands & Hearts reported on 1 October 2026 that Sano Paila received 100 litres of diesel and 5 litres of engine oil for the generator at Nilkantha Higher Secondary School Hostel displacement centre, Uttargaya-5, Rasuwa. The fuel supports the community kitchen, child protection space and other response activities. The organisation estimated 10 days of electricity for the 29 residents reported at that time. This is a completed delivery, not fuel available for collection, a guarantee of continuous power or confirmation of spare shelter places.

Key details
Offered by
All Hands & Hearts; Sano Paila
Service hours
Delivery reported 1 October 2026; 10-day power estimate, not a guarantee
Can I go there?
No public walk-in point
Amount or capacity
100 litres diesel and 5 litres engine oil delivered
Next step

Check the latest details before using this service.

Nepal flood response

Korea and UNDP hand over drones and backup generators to NDRRMA

OtherRelief Work Underway

Earlier informationDelivered
Overview

UNDP's 17 September 2026 announcement says camera-equipped drones and portable 3 kVA backup generators were delivered through UNDP Nepal and handed to NDRRMA with support from the Republic of Korea. This is equipment supplied to response authorities, not a public pickup or booking service. Equipment quantities and field deployment locations are not stated.

Key details
Offered by
Republic of Korea and UNDP
Service hours
Reported 17 September 2026
Next step

Check the latest details before using this service.

Rasuwa · Rasuwa

CLEAN UP NEPAL sends clothing and fuel to Rasuwa

OtherRelief Work Underway

Earlier informationShipment reported
Overview

CLEAN UP NEPAL reported on 16 September 2026 that clothing and fuel had been sent to flood-affected families in Rasuwa: 60 sweatshirts, 60 trousers, 120 baby T-shirts, 90 baby shorts, 47 baby sets and 10 litres of diesel for generator-powered electricity and mobile charging. This records a shipment, not confirmed distribution to every family or a public pickup point. Current stock, delivery locations and opening hours are not stated.

Key details
Offered by
CLEAN UP NEPAL
Service hours
Reported 16 September 2026; exact shipment time not stated
Amount or capacity
Clothing and 10 litres of diesel
Next step

Check the latest details before using this service.

Nepal; deployment sites not stated

Bobcat reportedly sends 15 equipment units for Nepal

OtherRelief Work Underway

Earlier informationIn transit
Overview

Yatra Magazine's 12 September 2026 report says Bobcat sent 15 machines and lighting units for Nepal's government on 11 September. The shipment has 2 backhoe loaders, 4 mini excavators, 6 tower lights and 3 skid-steer loaders. The company says the equipment is a permanent donation at no cost. The report does not confirm arrival or handover. Work sites, operators and public access are not stated.

Key details
Offered by
Bobcat
Service hours
Dispatch reported on 11 September 2026; arrival date not stated
Amount or capacity
15 units: 2 backhoe loaders, 4 mini excavators, 6 tower lights, 3 skid-steer loaders
Next step

Check the latest details before using this service.

Rasuwa · Uttargaya, Rasuwa; Bidur, Nuwakot

Karuna-Shechen relief in Bidur and Uttargaya

OtherRelief Work Underway

Earlier informationDistribution reported
Overview

Karuna-Shechen's 11 to 15 September 2026 update reports 7,000 litres of drinking water supplied daily to Bidur wards 7, 8 and 9. On 14 September, 24 community volunteers began Psychological First Aid training; shelter and school support was planned after training, not confirmed operational. Earlier aid included clothing, hygiene kits, blankets, kitchen supplies and food; jackets, torches and solar lights were being procured. These are dated activity reports, not confirmation of today's supply. Public pickup sites, hours and current stock are not stated.

Key details
Offered by
Karuna-Shechen
Service hours
Updates cover 5 to 15 September 2026
Next step

Check the latest details before using this service.

Rasuwa · Nepal flood-affected areas; a dispatch to Dhunche, Rasuwa, is reported

Fuel aid supports hospitals and relief kitchens

OtherRelief Work Underway

Earlier informationDistribution reported
Overview

An 11 September report says Fuel Relief Fund distributed over 800 litres of petrol and diesel in Nepal and supplied cooking gas to relief kitchens. The total is not limited to Rasuwa. A team left with 210 litres for Dhunche on 10 September; arrival is not confirmed. No public pickup point or remaining stock is stated.

Key details
Offered by
Fuel Relief Fund, reported by The Times of India
Service hours
Report updated 11 September 2026, 23:42 IST, equivalent to 23:57 NPT
Amount or capacity
Over 800 litres distributed across the reported operation; not current stock
Next step

Check the latest details before using this service.

Nuwakot · Trishuli, Bidur-2, Nuwakot

Israel's second relief phase reaches Bidur-2

OtherRelief Work Underway

Earlier informationDistribution reported
Overview

Radio Nepal reports that Israel's embassy distributed emergency packages in Trishuli, Bidur-2, on 11 September. This second-phase delivery is separate from its earlier Baireni, Dhading, distribution. Quantities, remaining stock and arrangements for new recipients were not announced. This is a reported delivery, not an ongoing public collection point.

Key details
Offered by
Embassy of Israel in Nepal, reported by Radio Nepal
Service hours
Distribution reported on 11 September 2026
Next step

Check the latest details before using this service.

Kathmandu · Tribhuvan International Airport, Kathmandu; onward sites not stated

China's fifth relief shipment arrives in Kathmandu

OtherRelief Work Underway

Earlier informationArrival reported
Overview

Radio Nepal and The Rising Nepal report that China's fifth relief shipment arrived in Kathmandu on 11 September afternoon. It includes diesel generators, protective masks, water-rescue equipment, mortuary freezers and DNA-testing supplies. Quantities and onward deployment sites are not stated. This is a separate airport delivery, not equipment confirmed available for public use.

Key details
Offered by
China relief shipment, reported by Radio Nepal and The Rising Nepal
Service hours
Arrival reported 11 September 2026 afternoon
Next step

Check the latest details before using this service.

Rasuwa · Thulo Syafru, Briddim, Thamjing and Sherpa Gaun, northern Rasuwa

152 solar systems reported provided to northern Rasuwa

OtherRelief Work Underway

Earlier informationDistribution reported
Overview

INSEC/RSS reported on 9 September that Chauni Gumba provided 152 solar power systems to northern Rasuwa: 42 large and 110 small. Named areas include Thulo Syafru, Briddim, Thamjing and Sherpa Gaun. The report does not confirm installation, remaining stock or a public collection point.

Key details
Offered by
Chauni Gumba, Swayambhu, Kathmandu
Service hours
Reported 9 September 2026; exact delivery dates not stated
Amount or capacity
152 systems: 42 large, 110 small; not remaining stock
Next step

Check the latest details before using this service.

Flood-affected areas; learning distributions in Galchhi and Gajuri, Dhading

Child-friendly spaces and learning-material support

OtherRelief Work Underway

Earlier informationRelief work underway
Overview

NDRRMA's 8 September, 7 pm report says 13 child-friendly spaces are operating in flood-affected areas, with play and psychosocial support. They have served 658 children, not 658 available places. Learning materials were distributed to 428 children in Galchhi and 147 in Gajuri. Plans to move families from school shelters are still being developed; regular classes are not confirmed reopened. Site hours and enrolment contacts are not listed.

Key details
Offered by
NDRRMA
Service hours
NDRRMA report: 8 September 2026, 19:00 NPT
Amount or capacity
13 spaces; 658 children served
Next step

Check the latest details before using this service.

Kathmandu · Tribhuvan International Airport, Kathmandu; later deployment sites not stated

China's fourth relief consignment arrives in Kathmandu

OtherRelief Work Underway

Earlier informationArrival reported
Overview

Nepal News reports China's fourth relief consignment arrived in Kathmandu on 8 September, with an airport handover. It includes rescue hovercraft, flood pumps, spare batteries, mortuary freezers and solar lights. Quantities and deployment sites were not stated. This is separate from the third consignment, not equipment confirmed available for public use.

Key details
Offered by
Chinese relief assistance, reported by Nepal News
Service hours
Arrival reported 8 September 2026; deployment schedule not stated
Next step

Check the latest details before using this service.

Rasuwa · Flood-affected areas; further household support planned in Rasuwa

Solar systems dispatched for 13 offices and 500 households

OtherRelief Work Underway

Earlier informationDispatch reported
Overview

Radio Nepal's 7 September report says the Energy Ministry sent 13 office solar systems and 500 household solar systems to flood-affected areas, using helicopters for remote deliveries. Solar support for a further 1,268 Rasuwa households is planned. These are dispatch and planning figures, not installed systems. Exact recipient sites, delivery completion and public collection arrangements were not stated. NDRRMA's 8 September, 7 pm report says air transport of six solar sets from Dhunche to final deployment sites is being arranged. Their relation to the earlier totals is not stated; do not add them.

Key details
Offered by
Ministry of Energy, Water Resources and Irrigation, reported by Radio Nepal
Service hours
NDRRMA report: 8 September 2026, 19:00 NPT
Amount or capacity
13 office and 500 household systems dispatched; 1,268 further households planned
Next step

Check the latest details before using this service.

Flood-affected students in Nepal, early childhood through Grade 12

Scholarship Bank planned; application details still pending

OtherRelief Work Underway

Earlier informationAnnounced
Overview

A 10 September report adds a planned central Scholarship Bank under the existing Ensuring Future scheme. Support through Grade 12 would include full, partial or residential scholarships and learning materials. Eligibility rules and application details are still to come. The 1,000-student pledge is not 1,000 completed awards.

Key details
Offered by
Education ministry programme, reported by The Kathmandu Post
Service hours
Plan updated 10 September 2026; application opening not announced
Amount or capacity
Pledged support for 1,000 students; awards not confirmed
Next step

Check the latest details before using this service.

Medical service disruptions

Do not travel to these facilities without checking first.

E. coli reported in five Bidur water samples; use treated water

The Himalayan Times reported on 7 September that five of 15 water samples from Bidur holding centres tested positive for E. coli. The district health office said the affected sources were treated and advised drinking purified water. This updates the earlier water-risk advice; it does not confirm cholera or that every source is now safe. Continue water treatment and hygiene precautions.

ActiveEarlier report
Full details

Baitadi · Khodpe, Patan Municipality ward 8, Baitadi

Khodpe coordinated rescue hub and helipad

OtherRelief Work Underway

Earlier informationRelief work underway
Overview

Gorkhapatra's 5 September report describes an existing rescue hub with a helipad in Khodpe. Security agencies hold search-and-rescue equipment there for regional deployment. The report says household relief stocks were unavailable; this is not a public pickup point or a newly opened centre.

Key details
Offered by
District disaster authorities, security agencies and local government
Next step

Check the latest details before using this service.

Nuwakot · Flood-affected shelter communities along the Bhote Koshi-Trishuli corridor

WOREC establishes private support spaces for women and girls

OtherRelief Work Underway

Earlier informationRelief work underway
Overview

WOREC is establishing private support spaces for women and adolescent girls in affected areas, the Kathmandu Post reported on 5 September. Addresses and service hours were not announced.

Key details
Offered by
WOREC
Can I go there?
No public walk-in point
Next step

Check the latest details before using this service.

Nepal Electricity Authority-coordinated tunnel rescue; deployment site not stated

Swiss tunnel-inspection drone handed to NEA

OtherRelief Work Underway

Earlier informationDelivered
Overview

Nepal News reported on 5 September that Switzerland handed a Flyability drone to the Nepal Electricity Authority for assessing hazardous tunnels. Its protective cage supports operation in confined spaces. The deployment site and public availability were not announced.

Key details
Offered by
Swiss assistance to Nepal Electricity Authority
Can I go there?
No public walk-in point
Next step

Check the latest details before using this service.

Nuwakot · Devighat, Nuwakot; earlier Haku Besi delivery in Rasuwa

China-provided drones support army relief deliveries

OtherRelief Work Underway

Earlier informationRelief work underway
Overview

Reuters reports on 9 September that four China-donated drones are helping Nepal's army deliver food, medicines and fuel. This updates the same operation earlier reported at Haku Besi. It is not a public booking service.

Key details
Offered by
Nepali Army; China-provided drones
Service hours
Reported 9 September 2026; no public booking schedule
Amount or capacity
4 drones reported
Next step

Check the latest details before using this service.

Rasuwa · Flood-isolated communities in Rasuwa

Garuda deploys 25 kg logistics drones for Rasuwa relief

OtherRelief Work Underway

Earlier informationRelief work underway
Overview

ICT Frame reported on 5 September that Garuda Aerospace was deploying Sanjeevani logistics drones in Rasuwa for food, water and medical deliveries. The stated payload limit is 25 kg. The company is providing batteries, communications and ground-support equipment, with certified pilots as required. Drone numbers, exact delivery sites and a public request process were not stated.

Key details
Offered by
Garuda Aerospace
Amount or capacity
Payload up to 25 kg; number of drones not stated
Next step

Check the latest details before using this service.

Nepal; exact field sites not stated

Malaysia's SMART team arrives with nine high-capacity drones

OtherRelief Work Underway

Earlier informationRelief work underway
Overview

Nepal's Foreign Ministry reported at 2 pm on 6 September that Malaysia's 11-member SMART rescue team arrived on 5 September with nine high-capacity drones matching the requested specifications. Exact field deployment sites and public service arrangements were not announced. This is government-coordinated rescue support, not equipment available for public booking.

Key details
Offered by
Malaysia SMART rescue team
Who can use this
Government-coordinated flood response
Amount or capacity
11 team members and 9 high-capacity drones; arrived 5 September 2026
Next step

Check the latest details before using this service.

Flood-affected communities in Nepal

Four-month flood response plan targets more than 84,000 people

OtherRelief Work Underway

Earlier informationPlanned
Overview

Radio Nepal reported on 4 September that a four-month response plan under NDRRMA leadership aims to help more than 84,000 people. Planned work includes winter shelter, portable solar units, water-system repairs, water purification, mobile health care, nutrition and food support. This is a programme target, not completed assistance or a public application point.

Key details
Offered by
NDRRMA, United Nations and humanitarian partners
Who can use this
Affected people supported through the coordinated response
Amount or capacity
Target: more than 84,000 people over four months; not an achieved total
Next step

Check the latest details before using this service.

Medical service disruptions

Do not travel to these facilities without checking first.

Health facilities damaged or not operating

HEOC's 4 September report lists four fully damaged health facilities and three partially damaged facilities. Access to Dhading Hospital and Trishuli Hospital is disrupted. Its earlier 2 September report marked Baireni Hospital in Galchhi and Charaudi Basic Health Service Center in Benighat as not operating. The 4 September report does not confirm that they have reopened. For help finding medical care, call 1115.

ActiveEarlier report
Full details

Rasuwa · Flood-affected hydropower and tunnel sites in Rasuwa and Nuwakot

Chilime rescue: 1,050-metre access track completed

OtherRelief Work Underway

Earlier informationRelief work underway
Overview

Nagarik's 12 September, 06:33 NPT report and DC Nepal's late 11 September report say a 1,050-metre track from Syafrubesi to the Chilime tunnel entrance is complete. Heavy equipment has reached the worksite after nine controlled blasts through the rocky approach. This improves access for rescue machinery, not public traffic. Internal tunnel breakthrough was still expected for 12 or 13 September, not confirmed. The ministry's separately dated updates say rescue operations continue across affected hydropower sites.

Key details
Offered by
Government of Nepal coordinated rescue and technical teams
Service hours
Reported 12 September 2026, 06:33 NPT; corroborating report 11 September, 22:40 NPT
Can I go there?
No public walk-in point
Who can use this
Government-assigned rescue and technical teams
Amount or capacity
1,050-metre access track; heavy-equipment count not stated
Before you go
Do not enter operational sites or attempt independent deployment without official authorization.
Next step

Check the latest details before using this service.

Nepal; exact operational sites not stated

Australia's 15-person disaster-response team arrives in Nepal

OtherRelief Work Underway

Earlier informationRelief work underway
Overview

Nepal's Ministry of Foreign Affairs confirmed in its 5 September, 2 pm update that Australia's 15-member Disaster Assistance and Response Team arrived in Nepal on 4 September. The team includes drone and disaster-response specialists. This replaces the earlier planned-departure update. Exact operating sites and public service arrangements were not announced.

Key details
Offered by
Government of Australia
Service hours
Arrived 4 September 2026; deployment end date not stated
Who can use this
Nepal authorities and communities supported after official deployment
Amount or capacity
15-person DART; arrival in Nepal confirmed for 4 September 2026
Before you go
Arrival is confirmed by Nepal's Ministry of Foreign Affairs. Exact field sites and public access were not announced.
Next step

Check the latest details before using this service.

Cloud-based weather-monitoring support for Nepal

MAZU AI weather-system technical support for Nepal

OtherRelief Work Underway

Earlier informationOperating
Overview

China's meteorological authorities provided Nepal with a customised cloud-based trial of the MAZU AI weather system, integrating Fengyun satellite and ground data for monitoring, forecasting, warnings and disaster-impact support. This is technical response infrastructure, not a public warning channel; users should continue to follow Nepal's DHM and local authorities for official instructions.

Key details
Offered by
China Meteorological Administration
Service hours
Trial system reported available; operational use details not public
Can I go there?
No public walk-in point
Who can use this
Nepal authorities and technical teams using the system
Amount or capacity
Cloud trial integrating Fengyun satellite and ground data
Before you go
For public warnings, continue to use Nepal DHM and local-authority channels.
Next step

Check the latest details before using this service.

Nuwakot · Tribhuvan Trishuli Secondary School, Bidur, Nuwakot

Tribhuvan Trishuli Secondary School, Bidur, Nuwakot

OtherRelief Work Underway

Earlier informationRelief work underway

India pledges reconstruction of Tribhuvan Trishuli Secondary School

Overview

India previously pledged to support full reconstruction of Tribhuvan Trishuli Secondary School in Bidur. Separately, NDRRMA's report dated 21 September 2026, 7 pm, says the school resumed operations in temporary structures that day. This does not confirm completion of the pledged permanent reconstruction. The report does not state class schedules, admission arrangements or public access to the damaged site.

Key details
Offered by
Government of India reconstruction pledge
Service hours
Commitment announced; construction start not confirmed
Who can use this
School community and education authorities during reconstruction
Amount or capacity
Full school reconstruction pledged; start date, design and completion schedule not stated
Before you go
Temporary school operations are reported. Class schedules, admissions and access to the damaged site are not stated.
Next step

Check the latest details before using this service.

United Kingdom support to Nepal flood response

United Kingdom announces GBP 5 million for Nepal flood response

OtherRelief Work Underway

Earlier informationRelief work underway
Overview

The United Kingdom announced GBP 5 million in support for Nepal's flood response through United Nations agencies, the Red Cross and non-governmental organisations. This is partner-channelled humanitarian funding, not a public grant application or direct pickup service through this website.

Key details
Offered by
Government of the United Kingdom
Service hours
Funding announced; partner allocations and locations vary
Who can use this
People reached through funded UN, Red Cross and NGO response programmes
Amount or capacity
GBP 5 million through UN agencies, Red Cross and NGOs
Before you go
This announcement does not create a direct grant or pickup route through this website.
Next step

Check the latest details before using this service.

Rasuwa · Kathmandu arrival for Nepal flood response; earlier team worked in Rasuwa

Second eight-member Korean relief team arrives in Kathmandu

OtherRelief Work Underway

Earlier informationRelief work underway
Overview

Yonhap's updated 11 September report, citing South Korea's Foreign Ministry, confirms that the second eight-member relief team arrived in Kathmandu at about 08:44 NPT that day. Its aircraft also brought about four tonnes of supplies, including tents, blankets and clothing. The seven-day mission focuses on recovery and reconstruction. This replaces the earlier planned-arrival report. Local deployment points, public service access and remaining supply stocks were not announced.

Key details
Offered by
Korea Disaster Relief Team, reported by Yonhap
Service hours
Arrived 11 September 2026 at about 08:44 NPT; seven-day mission announced
Can I go there?
No public walk-in point
Who can use this
Government-coordinated relief operation
Amount or capacity
Second team: 8 members; same flight: about 4 tonnes of supplies
Before you go
This team is deployed through official coordination.
Next step

Check the latest details before using this service.

Rasuwa · Upper Trishuli-1 Hydropower tunnel

Upper Trishuli 1 tunnel rescue continues

OtherRelief Work Underway

Earlier informationRelief work underway
Overview

Nepal's 10 September, 14:00 NPT official update lists Upper Trishuli 1 among the hydropower sites where search and rescue continue. International tunnel teams are supporting the Nepali Army across affected projects. No new tunnel-clearance distance or completion time is given for this site. The separate arrival of more Korean personnel does not establish their deployment to this particular tunnel. This is not a public access notice.

Key details
Offered by
Nepal Army, Korean tunnel rescue team and technical partners
Service hours
Official site-specific update issued 10 September 2026, 14:00 NPT
Can I go there?
No public walk-in point
Who can use this
Rescue operation update
Amount or capacity
Technical tunnel rescue operation
Before you go
Do not travel to the tunnel based on this card.
Next step

Check the latest details before using this service.

Flood-affected areas of Rasuwa, Nuwakot and Dhading

Electricity restoration reports use different measures

OtherRelief Work Underway

Earlier informationRelief work underway
Overview

NDRRMA's 8 September, 7 pm report says power was restored to 1,147 more homes in Bidur wards 10 and 11 and describes Nuwakot's electrification rate as 99%. Its 7 September report separately listed restored household connections: Rasuwa 78%, Nuwakot 96.7% and Dhading 99.8%. Rasuwa's 7 September note reported access for 85% of its population. These measures differ; do not calculate a change between them or assume every home has power.

Key details
Offered by
NDRRMA and District Administration Office, Rasuwa
Service hours
NDRRMA report: 8 September 2026, 19:00 NPT
Can I go there?
No public walk-in point
Amount or capacity
8 September: 1,147 more Bidur homes; Nuwakot electrification 99%
Before you go
This is an area-wide restoration update, not a public service point. Some locations may still have no supply or unstable voltage.
Next step

Check the latest details before using this service.

Rasuwa · Kathmandu; service for Rasuwa flood victims (reported

PADT says free cremation service is available at Aryaghat and Bhashmeshwar Ghat for deceased Rasuwa flood victims

OtherRelief Work Underway

Earlier information
Overview

PADT says free cremation service is available at Aryaghat and Bhashmeshwar Ghat for deceased Rasuwa flood victims. The operational contact is Sharad Raj Vaidya. Service hours, eligibility documents, body transport/mortuary coordination and expiry need confirmation.

Key details
Service hours
Confirm with provider
Next step

Check the latest details before using this service.

Nuwakot · Nuwakot; Upper Trishuli-3A tunnel (reported

Upper Trishuli 3A tunnel rescue continues

OtherRelief Work Underway

Earlier informationRelief work underway
Overview

Upper Trishuli 3A is listed in Nepal's 10 September, 14:00 NPT official update as a continuing search-and-rescue site. International tunnel teams are working with the Nepali Army across affected projects. The bulletin gives no new clearance distance, equipment count or completion time for 3A. This is a dated operation update, not confirmation that the tunnel is fully cleared or open to the public.

Key details
Service hours
Official site-specific update issued 10 September 2026, 14:00 NPT
Amount or capacity
Clearance distance and equipment count not stated in 10 September update
Next step

Check the latest details before using this service.

Rasuwa · Rasuwa; exact tunnel site unknown (reported

Global Times reports that four Chinese tunnel-rescue experts landed in Kathmandu and departed for a Rasuwa tunnel rescue site

OtherRelief Work Underway

Earlier information
Overview

Global Times reports that four Chinese tunnel-rescue experts landed in Kathmandu and departed for a Rasuwa tunnel rescue site. This may indicate changed specialist deployment, but the post does not identify the tunnel, Nepali command, arrival time or confirmation that the experts reached the site.

Key details
Service hours
Confirm with provider
Next step

Check the latest details before using this service.

Medical service disruptions

Do not travel to these facilities without checking first.

Post-flood water and food health risks in Chitwan

WHO lists Chitwan among affected districts and identifies unsafe water and food and diarrhoeal illness as post-flood risks. No outbreak is confirmed by this source.

InfoEarlier report
Full details

Showing 34 of 34

Show fewer