Health help
Medical help, rescue coordination, hospital-bed information, and 24-hour mental health support.
Official sourceFind a service, a drop-off point, an offer, or relief work. Services can change quickly. Check the update time before you travel.
Use these numbers for urgent rescue or medical help. They are not ordinary relief services.
Medical help, rescue coordination, hospital-bed information, and 24-hour mental health support.
Official sourceNuwakot · Trishuli, Bidur-2, Nuwakot
OtherRelief Work Underway
Radio Nepal reports that Israel's embassy distributed emergency packages in Trishuli, Bidur-2, on 11 September. This second-phase delivery is separate from its earlier Baireni, Dhading, distribution. Quantities, remaining stock and arrangements for new recipients were not announced. This is a reported delivery, not an ongoing public collection point.
Check the latest details before using this service.
Do not travel to these facilities without checking first.
The Himalayan Times reported on 7 September that five of 15 water samples from Bidur holding centres tested positive for E. coli. The district health office said the affected sources were treated and advised drinking purified water. This updates the earlier water-risk advice; it does not confirm cholera or that every source is now safe. Continue water treatment and hygiene precautions.
ActiveEarlier reportNuwakot · Flood-affected shelter communities along the Bhote Koshi-Trishuli corridor
OtherRelief Work Underway
WOREC is establishing private support spaces for women and adolescent girls in affected areas, the Kathmandu Post reported on 5 September. Addresses and service hours were not announced.
Check the latest details before using this service.
Nuwakot · Devighat, Nuwakot; earlier Haku Besi delivery in Rasuwa
OtherRelief Work Underway
Reuters reports on 9 September that four China-donated drones are helping Nepal's army deliver food, medicines and fuel. This updates the same operation earlier reported at Haku Besi. It is not a public booking service.
Check the latest details before using this service.
Rasuwa · Flood-affected hydropower and tunnel sites in Rasuwa and Nuwakot
OtherRelief Work Underway
Nagarik's 12 September, 06:33 NPT report and DC Nepal's late 11 September report say a 1,050-metre track from Syafrubesi to the Chilime tunnel entrance is complete. Heavy equipment has reached the worksite after nine controlled blasts through the rocky approach. This improves access for rescue machinery, not public traffic. Internal tunnel breakthrough was still expected for 12 or 13 September, not confirmed. The ministry's separately dated updates say rescue operations continue across affected hydropower sites.
Check the latest details before using this service.
Nepal; exact operational sites not stated
OtherRelief Work Underway
Nepal's Ministry of Foreign Affairs confirmed in its 5 September, 2 pm update that Australia's 15-member Disaster Assistance and Response Team arrived in Nepal on 4 September. The team includes drone and disaster-response specialists. This replaces the earlier planned-departure update. Exact operating sites and public service arrangements were not announced.
Check the latest details before using this service.
Cloud-based weather-monitoring support for Nepal
OtherRelief Work Underway
China's meteorological authorities provided Nepal with a customised cloud-based trial of the MAZU AI weather system, integrating Fengyun satellite and ground data for monitoring, forecasting, warnings and disaster-impact support. This is technical response infrastructure, not a public warning channel; users should continue to follow Nepal's DHM and local authorities for official instructions.
Check the latest details before using this service.
Nuwakot · Tribhuvan Trishuli Secondary School, Bidur, Nuwakot
OtherRelief Work Underway
India previously pledged to support full reconstruction of Tribhuvan Trishuli Secondary School in Bidur. Separately, NDRRMA's report dated 21 September 2026, 7 pm, says the school resumed operations in temporary structures that day. This does not confirm completion of the pledged permanent reconstruction. The report does not state class schedules, admission arrangements or public access to the damaged site.
Check the latest details before using this service.
United Kingdom support to Nepal flood response
OtherRelief Work Underway
The United Kingdom announced GBP 5 million in support for Nepal's flood response through United Nations agencies, the Red Cross and non-governmental organisations. This is partner-channelled humanitarian funding, not a public grant application or direct pickup service through this website.
Check the latest details before using this service.
Flood-affected areas of Rasuwa, Nuwakot and Dhading
OtherRelief Work Underway
NDRRMA's 8 September, 7 pm report says power was restored to 1,147 more homes in Bidur wards 10 and 11 and describes Nuwakot's electrification rate as 99%. Its 7 September report separately listed restored household connections: Rasuwa 78%, Nuwakot 96.7% and Dhading 99.8%. Rasuwa's 7 September note reported access for 85% of its population. These measures differ; do not calculate a change between them or assume every home has power.
Check the latest details before using this service.
Nuwakot · Nuwakot; Upper Trishuli-3A tunnel (reported
OtherRelief Work Underway
Upper Trishuli 3A is listed in Nepal's 10 September, 14:00 NPT official update as a continuing search-and-rescue site. International tunnel teams are working with the Nepali Army across affected projects. The bulletin gives no new clearance distance, equipment count or completion time for 3A. This is a dated operation update, not confirmation that the tunnel is fully cleared or open to the public.
Check the latest details before using this service.