Shri Ram Neupane has requested a "Rear Cross" part for a Kawasaki ZV60 wheel loader to support rescue work at the Chilime hydropower project. The post describes it as joining the front and back wheels. The part number, size and quantity are not given. Supply has not been confirmed. If you can help, contact Nepal Flood Relief Network. Confirm the exact part before arranging delivery.
This request includes
Rear Cross for Kawasaki ZV60
Key details
Rasuwa
Chilime hydropower project
Needed by
Urgent; no deadline stated
Request from
Shri Ram Neupane
Review the items and location before offering help.
A holding centre in Gajuri-5 requested 52 solar lights on 11 September. A volunteer offered to follow up directly. Delivery has not been confirmed. Contact Nepal Flood Relief Network to offer help.
This request includes
52 solar lights
Key details
Dhading
Gajuri-5
Request from
First responder WhatsApp group
Review the items and location before offering help.
The Kathmandu Post reports an urgent need for seven Bailey bridges, spanning 30-70 metres, between Rasuwagadhi and Syafrubesi. Damaged approach roads impede transport. Coordinate sites, specifications and delivery with the Department of Roads; this is not a public crossing or drop-off.
This request includes
Temporary bridges
Key details
Rasuwa
Rasuwagadhi-Syafrubesi, Rasuwa
Needed by
Urgent; no deadline stated
Request from
Department of Roads, reported by The Kathmandu Post
Review the items and location before offering help.
Rasuwa's 5 September disaster committee decisions request cable crossings and wire mesh at Syafrubesi-Chilime, Hangu Khola and Pahirebesi-Shantibazar to move essentials. Engineering agencies must coordinate this work. These are requested works, not confirmed usable crossings; material quantities were not stated.
This request includes
Three requested crossing works, not open routes
Key details
Rasuwa · Nuwakot
Syafrubesi-Chilime, Hangu Khola and Pahirebesi-Shantibazar
Needed by
Urgent request dated 5 September; completion date not stated
Request from
District Disaster Management Committee, Rasuwa
Review the items and location before offering help.
Rasuwa's 5 September disaster committee asks responsible agencies to install and operate riverbank early-warning systems, sirens and water-level stations. Locations and quantities are not specified. This is an infrastructure request, not confirmation that the warning network is operating.
This request includes
Warning infrastructure installation requested
Key details
Rasuwa
Riverbank areas of Rasuwa; exact sites not stated
Needed by
Requested 5 September; deadline not stated
Request from
District Disaster Management Committee, Rasuwa
Review the items and location before offering help.
Hami Nepal still needs a 4x4 vehicle for relief deliveries to Upper Rasuwa. A 6 September Instagram update asks for a four-wheel-drive vehicle and gives contact 9748276439. The earlier request says the vehicle may travel from Kathmandu or Bidur with food, water, medicine and other relief items. The number of vehicles, load size and deadline are not stated.
This request includes
4x4 vehicle support for relief deliveries to Upper Rasuwa
Key details
Rasuwa · Nuwakot
Kathmandu or Bidur to Upper Rasuwa
Request from
Hami Nepal
Review the items and location before offering help.
On 6 September, @rj.agr shared a 27-item rescue equipment list in the first-responder group. It includes 82 complete mud rescue suits, 52 breathing apparatus sets and 26 multi-gas detectors. All reported quantities are listed below. Partial support is welcome. Contact the coordinator to confirm the exact equipment, rescue site and handover before supplying goods. The 3 September portable oxygen-cylinder request had no stated quantity; breathing apparatus sets are not the same item.
This request includes
Mud rescue complete suit: 82 sets
"Inflatable Walk Away" (source wording): 78 sets
Mud lance: 26 sets
Rescue sled: 26 sets
+24 more items
Key details
Where
Nepal; exact tunnel and handover location not stated
Needed by
Urgent; exact deadline not stated
Request from
Nepal Flood Relief Network
Review the items and location before offering help.
Multiple 4WD cargo trucks are needed for ongoing relief trips from Kathmandu to Rasuwa and other flood-affected areas, and back. If you can provide a truck or connect the team with an owner, DM @nepalfloodreliefnetwork on Instagram. The request does not state an exact number, load capacity, or driver and fuel arrangements. The image is a reference, not a required model.
This request includes
Multiple 4WD cargo trucks for relief trips
Key details
Rasuwa
Kathmandu to Rasuwa and other flood-affected areas, and return trips
Needed by
Ongoing relief trips; no exact deadline stated
Request from
Nepal Flood Relief Network
Review the items and location before offering help.
Nepal's foreign ministry lists underwater drones and portable generators in its 9 September, 2 pm equipment request. It also requests high-capacity drones, LiDAR, Bailey bridges, disease-prevention supplies, DNA kits, high-capacity pumps, laboratory freezers and mud/tunnel rescue suits. Quantities and receiving points are not stated. Earlier requested items are not confirmed fulfilled; arrange specifications and delivery through government coordination.
This request includes
Specialised rescue, access, health and technical equipment
Key details
Rasuwa · Nuwakot · Dhading
Government-coordinated flood response in affected districts
Needed by
Urgent; coordinate through Government of Nepal
Request from
Government of Nepal, Ministry of Foreign Affairs
Review the items and location before offering help.
The Kathmandu Post's 8 September update reports a delivery bottleneck: 250 sacks of rice await airlift from Dhunche to Mailung and nearby Uttargaya-4 settlements. Aamachhodingmo's five wards also need food. Coordinate onward transport with district and local authorities; this is not a request to donate another 250 sacks. Earlier fuel shortages elsewhere are not newly quantified.
This request includes
Food delivery and onward transport
Key details
Rasuwa
Uttargaya, Aamachhodingmo, Kalika, Naukunda and Gosainkunda
Needed by
Urgent; local confirmation required
Request from
Local representatives reported by The Kathmandu Post
Review the items and location before offering help.
OnlineKhabar reports on 6 September that a 13-member Survey Department-led committee has begun coordinating with local authorities and collecting relocation data in Rasuwa, Nuwakot and Dhading. Land identification and risk assessment are next steps, not completed resettlement. Safe transitional shelter, cold-weather supplies and reconstruction remain priorities. The earlier 5 September assessment counted about 7,570 affected houses and 32,933 people, not homes all destroyed; older estimates used different definitions.
This request includes
Safe shelter, cold-weather materials, portable solar and reconstruction
Key details
Rasuwa · Nuwakot · Dhading
Flood-affected communities requiring safer transitional shelter and reconstruction
Needed by
Longer-term priority; local assessments required
Request from
NDRRMA and Government of Nepal; UN shelter partners
Review the items and location before offering help.
15 October 2026 update: Nepal Red Cross Society reports that piped water in Battar, Bidur, is available for about one hour every few days after flood damage. With IFRC support, NRCS is drilling a borewell to provide a safe drinking-water source. The post does not report that the borewell is operational or that full supply has been restored. Current water quantities and a public relief-coordination contact are not stated. Earlier context: A 6 September report described seven pumps serving about 500 Battar households and four tankers serving Bidur and Battar. Those figures are historical, not a new confirmation of present service.
This request includes
Emergency water and system repair
Key details
Nuwakot
Bidur and nearby Nuwakot water-supply areas
Needed by
Urgent and ongoing; current repair schedule not stated
Request from
Nepal Red Cross Society
Review the items and location before offering help.