Back to list
Nuwakot · Coordination neededEarlier reportCheck again

Emergency water supply and repair needed for Bidur water systems

Bidur and nearby Nuwakot water-supply areas

15 October 2026 update: Nepal Red Cross Society reports that piped water in Battar, Bidur, is available for about one hour every few days after flood damage. With IFRC support, NRCS is drilling a borewell to provide a safe drinking-water source. The post does not report that the borewell is operational or that full supply has been restored. Current water quantities and a public relief-coordination contact are not stated. Earlier context: A 6 September report described seven pumps serving about 500 Battar households and four tankers serving Bidur and Battar. Those figures are historical, not a new confirmation of present service.

This request includes

  • Emergency water and system repair
Request from
Nepal Red Cross Society
Amount or capacity
Earlier 2 September estimates: nearly 6,000 households served; 7 to 8 km pipeline damaged; around 20 lifting systems affected. Current unmet water quantity not stated.
Needed by
Urgent and ongoing; current repair schedule not stated
Road or transport limit
Confirm the current repair stage, priority neighbourhoods and handoff with the water authority before dispatch.
Coordinate through
Local water authority and municipal response
Checked: 15 Oct, 7:48 pm NPT