Back to list
Dhading · Relief workEarlier reportCheck again

Water supply restored in Baireni Bazaar

Baireni Bazaar, Galchhi-6
Amount or capacity
About 200 households; more than 550 people
Offered by
NDRRMA
Can help
Dhading
Available
Report cutoff: 19 September 2026, 19:00 NPT
Service hours
Supply hours not stated
Before you go
Existing local network; no public collection point specified.
Transport
Unknown
Driver or operator
Unknown

About this service

NDRRMA's report dated 19 September, with a 7 pm NPT cutoff, says water supply has resumed in Baireni Bazaar, Galchhi-6, Dhading, benefiting about 200 households and more than 550 people. More than 1,700 metres of HDPE pipe, storage tanks and submersible pumps support distribution through the existing network. The report does not give an exact restoration date, household supply hours, a public collection point or a contact. This is a reported restoration of local supply, not confirmation that all water needs in Galchhi are met.

Checked: 20 Sept, 10:28 am NPT