Road and bridge updates

See recent road, bridge, and relief-point updates.

An unmarked road may still be unsafe or closed.Check locally before travel.
8 of 101 updates are on the mapGrey points are earlier reports. Check the time before travel.

Latest road and bridge reports101

Road · Not specified by policeRoad update

Open for stated vehicle class

Galaundi Prithvi Highway reopened at 06:10 NPT

Overview

Nepal Police's 13 October 2026, 06:35 NPT notice reports that the Prithvi Highway at Galaundi, Gajuri-5, Dhading, reopened at 06:10 NPT after overnight road repairs. This replaces the earlier scheduled full-closure notice. Vehicle classes, weight limits and lane arrangements are not specified. The reopening applies to this named section, not every road in Dhading.

Key details

Dhading, Galaundi (Galaudi), Gajuri-5Source posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Bridge · No exception statedRoad update

Blocked

Soti bridge washed away; road blocked

Overview

Nepal Police's 11 October 2026, 15:00 NPT bulletin reports that flooding washed away the motorable bridge at Soti linking Arughat wards 2 and 3, Gorkha, completely blocking the road. The notice dates the upstream avalanche and flood event to 05:30 NPT that day. No reopening time, replacement crossing or vehicle exception is stated.

Key details

Soti, Arughat wards 2 and 3, GorkhaSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Bridge · No exception statedRoad update

Blocked

Arughat-Dhading bridge washed away; road blocked

Overview

Nepal Police's 11 October 2026, 15:00 NPT bulletin reports that flooding washed away the bridge connecting Arughat-9, Gorkha, to Dhading, completely blocking the road. The notice dates the upstream avalanche and flood event to 05:30 NPT that day. No reopening time, replacement crossing or vehicle exception is stated. This is a bridge-loss event, separate from the earlier Bhanjyang landslide.

Key details

Arughat-9, Gorkha, bridge towards DhadingSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · Freight: maximum 10 wheels and 15 tonnes, except fuel/LPG carriers; passenger vehicle length maximum 11 mRoad update

Restricted

Tribhuvan Highway: 10–11 October traffic windows and vehicle limits

Overview

Nepal Police's 10 October 2026, 17:15 NPT bulletin sets directional traffic windows on Tribhuvan Highway. Kathmandu to Hetauda: 10 October 09:00–12:00 and 22:00–01:00 on 11 October; 11 October 14:00–19:00. Hetauda to Kathmandu: 10 October 02:00–05:00 and 15:00–18:00; 11 October 04:00–10:00. All times are Nepal time. Until further arrangements, freight vehicles with more than 10 wheels or loads above 15 tonnes are barred, except vehicles carrying fuel or LPG. Passenger vehicles must be no longer than 11 metres. These are traffic-control windows, not a guarantee of clear passage; check current police instructions before travel. Earlier 10 September one-way movement at Sopyang Khola does not establish today's condition there.

Key details

Hetauda, Makawanpur, via Naubise, Dhading, to Thankot, KathmanduSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Blocked

Karnali Corridor blocked at three Kharpunath locations

Overview

Nepal Police's 30 September 2026, 15:00 NPT bulletin lists landslide blockages on the Karnali Corridor at Musedi, Kharpunath-1, and at Bisaunendanda and Shyamne Khola, Kharpunath-5, Humla. The reported event time is 27 September at 07:40 NPT. No reopening time, alternative route or vehicle exception is stated.

Key details

Humla, Musedi, Kharpunath-1; Bisaunendanda and Shyamne Khola, Kharpunath-5Source posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Blocked

Karnali Corridor blocked at Syaltadi

Overview

Nepal Police's 30 September 2026, 15:00 NPT bulletin lists the Karnali Corridor blocked by a landslide at Syaltadi, Sarkegad-6, Humla. The reported event time is 28 September at 08:40 NPT. No reopening time, alternative route or vehicle exception is stated.

Key details

Humla, Syaltadi, Sarkegad-6Source posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Blocked

Simkot-Hilsa road blocked at Yalbang

Overview

Nepal Police's 30 September 2026, 15:00 NPT bulletin lists the Simkot-Hilsa road blocked by a landslide at Yalbang, Namkha-4, Humla. The reported event time is 28 September at 09:00 NPT. No reopening time, alternative route or vehicle exception is stated.

Key details

Humla, Yalbang, Namkha-4Source posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Blocked

Simkot-Hilsa road blocked at Thadodhunga

Overview

Nepal Police's 30 September 2026, 15:00 NPT bulletin lists the Simkot-Hilsa road blocked by a landslide at Thadodhunga, Simkot-7, Humla. The reported event time is 28 September at 09:00 NPT. No reopening time, alternative route or vehicle exception is stated.

Key details

Humla, Thadodhunga, Simkot-7Source posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Blocked

Kaligandaki Corridor fully blocked at Janti Pahiro

Overview

Nepal Police's 30 September 2026, 12:00 NPT bulletin reports the Kaligandaki Corridor fully blocked at Janti Pahiro, Baudikali-3, Nawalpur. At 06:45 NPT that day, half of the roadway subsided along approximately 25 to 30 metres. No reopening time, alternative route or vehicle exception is stated.

Key details

Janti Pahiro, Baudikali-3, NawalpurSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Restricted

Prithvi Highway: one-way traffic at Krishnabhir

Overview

The Kathmandu Post's 29 September update, citing Department of Roads spokesperson Shubha Raj Neupane, reports traffic restored on Prithvi Highway, with one-way movement at Krishnabhir while work continues to restore two-way traffic. This supersedes the earlier blanket-closure report, not every local restriction. Vehicle classes and weight limits are not specified.

Key details

Krishnabhir, Tingrangkhani, Parewa Bhir and Bange Mod, DhadingSource posted:

Next step

Check locally before you travel.

The Kathmandu Post, citing Department of Roads spokespersonChecked:
View source

RoadRoad update

Restricted

Krishnabhir: one-way traffic restored

Overview

The Kathmandu Post's 29 September update, citing Department of Roads spokesperson Shubha Raj Neupane, reports traffic restored on Prithvi Highway, with one-way movement at Krishnabhir while work continues to restore two-way traffic. This supersedes the earlier blanket-closure report, not every local restriction. Vehicle classes and weight limits are not specified.

Key details

Krishnabhir, Benighat Rorang, DhadingSource posted:

Next step

Check locally before you travel.

The Kathmandu Post, citing Department of Roads spokespersonChecked:
View source

RoadRoad update

Restricted

BP Highway: traffic restored through temporary Chowkidanda track

Overview

Radio Nepal's 29 September report, citing the Road Division Office in Bhaktapur, says BP Highway traffic resumed at 10:40 that morning through a temporary inner track at Chowkidanda. High river flow prevented a river-bank diversion; the temporary track is to be used for a few days. Vehicle classes, weight limits and traffic-control hours are not stated. This is a reported reopening through a temporary route, not unrestricted normal-road access.

Key details

Not stated, BP Highway at ChowkidandaSource posted:

Next step

Check locally before you travel.

Radio Nepal, citing Road Division Office BhaktapurChecked:
View source

RoadRoad update

Open for stated vehicle class

NH17: Galchhi-Junction Trisuli bridge section reopened

Overview

The Department of Roads lists NH17's Galchhi-Junction Trisuli bridge section as reopened after a landslide at 17:00 on 29 September. Vehicle classes, weight limits and lane arrangements are not stated. This report applies only to the named section, not the whole highway or the separate Galchhi-Trishuli right-bank alternative.

Key details

Not stated, NH17: Galchhi-Junction Trisuli bridgeSource posted:

Next step

Check locally before you travel.

Department of Roads, highway status dashboardChecked:
View source

Road · No vehicle exception statedRoad update

Blocked

Kanti Lokpath: Takurche and Pangdurdol blocked

Overview

Nepal Police's 27 September, 13:50 NPT bulletin reports Kanti Lokpath blocked by a muddy landslide at Takurche, Bagmati-3, Lalitpur, and falling rocks at Pangdurdol. The reported incident time is 03:40 NPT that day. No reopening time or vehicle exception is stated. This is not an available through-route.

Key details

Makwanpur, Kanti Lokpath through Makawanpur and Lalitpur, serving Hetauda-Kathmandu travelSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · All vehicles barred until further noticeRoad update

Blocked

Parewa Bhir: both directions blocked in 25 September police bulletin

Overview

Nepal Police's bulletin of 25 September 2026, 22:00 NPT, reports Prithvi Highway blocked in both directions at Krishnabhir and Tingrangkhani in Benighat Rorang, and Parewa Bhir and Bange Mod in Gajuri, following landslides with large rocks from about 23:10 NPT on 24 September. All vehicles are barred from the affected Dhading section until further notice. This supersedes the earlier reopening reports; no reopening time is confirmed. Follow official traffic instructions.

Key details

Parewa Bhir, DhadingSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · All vehicles barred until further noticeRoad update

Blocked

Narayangadh-Muglin closed: earlier Tuin Khola traffic windows no longer travel guidance

Overview

Nepal Police's 25 September 2026, 22:00 NPT bulletin states that all vehicle movement on the Narayangadh-Muglin road is closed until further notice because of repeated landslides during rain since 24 September. This corridor closure overrides the earlier Tuin Khola construction timetable as travel guidance: do not rely on its half-hour gaps or after-18:00 windows. A reopening time is not confirmed.

Key details

Tuin Khola, Narayangadh-Muglin road, ChitwanSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road clearanceRoad update

Blocked

Bidur-Betrawati road clearance; through traffic not confirmed

Overview

OnlineKhabar/RSS reported on 22 September, citing the Department of Roads, that nine kilometres of the roughly 10-km Bidur-Betrawati section had reopened, while about 300 metres remained blocked by a landslide. The Army was blasting from both sides to open a track. These reported distances are not a complete segment inventory. The wider Galchhi-Syabrubesi reopening before Dashain is a target, not confirmed through access. Police's 23 September, 09:00 NPT notice still lists the main river-bank highway as blocked. Vehicle limits and a confirmed reopening date for this section are not stated.

Key details

Nuwakot, Bidur-Betrawati corridor, including Dhunge Bazaar approachSource posted:

Next step

Check locally before you travel.

OnlineKhabar/RSS, citing Department of Roads; Nepal PoliceChecked:
View source

RoadRoad update

Blocked

Khandbari–Kimathanka road blocked at Neta Bhir

Overview

Nepal Police's 19 September 2026, 15:30 NPT bulletin reports the Khandbari–Kimathanka section of the Koshi Highway fully blocked at Neta Bhir, Makalu-4, Sankhuwasabha, following a landslide after overnight rain on 18 September. No reopening time, alternative route or vehicle exception is stated.

Key details

Sankhuwasabha, Neta Bhir, Makalu-4Source posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Blocked

Prithvi Highway blocked at Jyamire Ghat, Dhading

Overview

Nepal Police's 18 September 2026, 15:12 NPT bulletin reports the Prithvi Highway fully blocked at Jyamire Ghat, Benighat Rorang-9, Dhading, at about 14:00 NPT because rain had made the road slippery. The morning bulletin had reported a landslide blockage at this section. No reopening time, alternative route or vehicle exception is stated. Krishnabhir's separate reopening on 17 September does not establish through-passage here.

Key details

Dhading, Jyamire Ghat, Benighat Rorang-9Source posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · Small vehicles onlyRoad update

Open for stated vehicle class

Besisahar-Chame road at Khotro reopened for small vehicles

Overview

An RSS report published by Ratopati on 18 September at 12:25 NPT, citing road-project information officer Navin Bista, says the Besisahar-Chame road at Khotro, Naso-3, Manang, reopened that morning for small vehicles after rocks and landslide debris were cleared. Large vehicles are not yet able to use the section. No exact reopening hour, weight limit or traffic-control hours are given. Check locally before travel.

Key details

Khotro, Naso-3, ManangSource posted:

Next step

Check locally before you travel.

RSS via RatopatiChecked:
View source

RoadRoad update

Blocked

Mechi Highway blocked at Khokse Khola, Taplejung

Overview

Nepal Police's 18 September 2026, 09:26 NPT bulletin lists the Mechi Highway as fully blocked at Khokse Khola, Pathibhara Yangwarak-1, Taplejung. At about 06:00 NPT, a landslide fell from roughly 50 metres above the road. No reopening time, alternative route or vehicle exception is stated.

Key details

Taplejung, Khokse Khola, Pathibhara Yangwarak-1Source posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Blocked

Karnali Corridor blocked at Milan Chok, Humla

Overview

Nepal Police's 17 September 2026, 21:00 NPT bulletin lists the Karnali Corridor as fully blocked at Milan Chok, Sarkegad-4, Humla, following a landslide at 07:00 NPT on 16 September. No reopening time, alternative route or vehicle exception is stated.

Key details

Milan Chok, Sarkegad-4, HumlaSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Restricted

Prithvi Highway: single-lane restrictions at Galchhi and Baireni

Overview

The Kathmandu Post's 17 September report says Galchhi and Baireni on the Prithvi Highway remain restricted to one lane after erosion and landslides. Krishnabhir's reopening does not mean the whole highway has unrestricted two-way traffic. Vehicle classes, weight limits and traffic-control hours at these sections are not stated. The earlier 2 September report also listed Jarikhet, Pokhare, Munge and Galaudi; their current condition is not reconfirmed by this update.

Key details

Galchhi and Baireni, DhadingSource posted:

Next step

Check locally before you travel.

The Kathmandu Post; earlier Nepal Views reportChecked:
View source

Road · Passenger and freight traffic reported; weight limits not statedRoad update

Open for stated vehicle class

Krishnabhir: two-way traffic reported from 17 September

Overview

OnlineKhabar and Kathmandu Post report that two-way traffic resumed on Krishnabhir's new track in Dhading on 17 September. OnlineKhabar cites district police confirming vehicles operating in both directions that morning, following the administration's 06:00 reopening decision. Landslide, falling-rock and road-subsidence risks remain; retaining-wall and drainage work continues. Follow on-site traffic control. The reports do not give weight limits or a complete daily operating schedule, and do not establish safe passage along every section of the highway.

Key details

Krishnabhir, Benighat Rorang, DhadingSource posted:

Next step

Check locally before you travel.

OnlineKhabar and Kathmandu PostChecked:
View source

RoadRoad update

Blocked

Karnali Corridor blocked at Kharikhet, Humla

Overview

Nepal Police's 14 September 2026, 21:30 NPT bulletin reports the Karnali Corridor fully blocked at Kharikhet, Sarkegad-6, Humla, after a landslide at 19:00 NPT that day. No reopening time, alternative route or vehicle exception is stated.

Key details

Kharikhet, Sarkegad-6, HumlaSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · No vehicle exception statedRoad update

Blocked

Arniko Highway blocked at Ghattekhola

Overview

Nepal Police's 14 September 2026, 11:00 NPT bulletin reports the Arniko Highway fully blocked at Ghattekhola, Bhotekoshi-2, Sindhupalchok, after road subsidence at about 06:30 NPT that day. No reopening time or vehicle exception is stated.

Key details

Ghattekhola, Bhotekoshi-2, SindhupalchokSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Temporary crossing · Cable crossings for people and supplies; not vehicle bridgesRoad update

Restricted

Four cable crossings operating in Indrayani, Devighat and Simchaur

Overview

Nuwakot's 13 September, 18:00 NPT report lists four completed, operating cable crossings: two from Indrayani Chaur in Bidur-9 towards Koloni Gumba, one at Devighat and one at Simchaur. These are four installations at three named areas, not four additional crossings on top of earlier Bidur reports. They are not vehicle bridges. Exact entrances, public hours and permitted loads are not stated.

Key details

Indrayani Chaur, Bidur-9 to Koloni Gumba; Devighat; Simchaur, NuwakotSource posted:

Next step

Check locally before you travel.

Nuwakot District Administration OfficeChecked:
View source

Footbridge · Pedestrians; vehicle access not reportedRoad update

Open for stated vehicle class

Temporary wooden footbridge reported at Betrawati

Overview

Nuwakot's 13 September, 18:00 NPT report says a temporary wooden footbridge has been built at Betrawati, shortening a previously four-hour route to about 15 minutes. This is a pedestrian crossing, not the planned Bailey road bridge. Vehicle access, load limits, operating hours and exact entrances are not stated. Follow local instructions before crossing.

Key details

Betrawati, Nuwakot-Rasuwa connectionSource posted:

Next step

Check locally before you travel.

Nuwakot District Administration OfficeChecked:
View source

Road and bridgeRoad update

Restricted

Water over Kulo Khola bridge; Ratmate road repairs continue

Overview

Nuwakot's 13 September, 18:00 NPT report says Kulo Khola bridge on the Galchhi-Devighat road has been cleared and the road is operating, but water is flowing over the bridge. Repairs continue on the eroded road section at Ratmate. Do not treat this as a dry or unrestricted route. The report does not state vehicle classes, water depth, load limits or operating hours.

Key details

Not stated, Kulo Khola bridge, Galchhi-Devighat road; Ratmate approachSource posted:

Next step

Check locally before you travel.

Nuwakot District Administration OfficeChecked:
View source

RoadRoad update

Blocked

Mid-Hill Highway blocked at Bhanjyang, Arughat-9

Overview

Nepal Police's 13 September 2026, 11:26 AM NPT notice reports that a dry landslide fully blocked the Arughat-Gorkha road at Bhanjyang, Arughat-9, Gorkha, at about 9:30 AM that day. This section is part of the Mid-Hill Highway. Rocks and soil fell from about 50 metres above the road. The notice gives no reopening time or alternative route.

Key details

Bhanjyang, Arughat-9, GorkhaSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · Large vehiclesRoad update

Restricted

Dharapani's 12-13 September restriction; later status unconfirmed

Overview

The scheduled restriction in Nepal Police's 12 September, 19:00 NPT notice has passed: large vehicles were barred until 10:00 NPT on 13 September, while the listed small-vehicle closure was 09:00-17:00 on 12 September. The notice concerned concrete road work at Dharapani, Naso-3, on Chame-Besisahar road and listed no alternative. No later reopening confirmation was obtained in this review. This is dated restriction history, not a claim that the road is now open.

Key details

Dharapani, Naso-3, ManangSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · No vehicle exception statedRoad update

Blocked

Gagane Khola: road damaged, Karnali Highway blocked

Overview

Nepal Police's 11 September, 20:42 NPT bulletin says the Karnali Highway at Gagane Khola, Shubhakalika-1, Kalikot, was fully blocked at 18:30 after rain-swollen water damaged the road. This replaces the 8 September reopening report. No reopening time or alternative route is stated.

Key details

Gagane Khola, Shubhakalika-1, KalikotSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · No vehicle exception statedRoad update

Blocked

Kamere Bhir: both directions blocked after new landslide

Overview

Police's 11 September, 11:42 NPT bulletin reports that a dry landslide at Kamere Bhir, Thakre-2, fully blocked both directions of the Prithvi Highway at about 04:40 that morning. This replaces the earlier one-way report for this section. No reopening time or vehicle exception is stated.

Key details

Kamere Bhir, Thakre-2, DhadingSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · No vehicle exception statedRoad update

Blocked

Phidim-Phalot road blocked at Akashe Bhanjyang

Overview

Nepal Police's 11 September, 11:42 NPT bulletin reports a rain-triggered landslide at Akashe Bhanjyang, Phalelung-8, at about 08:30 that morning. The Phidim-Phalot road section is fully blocked. No reopening time or vehicle exception is stated. Check the latest local traffic instructions before travel.

Key details

Akashe Bhanjyang, Phalelung-8, PanchtharSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · No vehicle exception statedRoad update

Blocked

Shahid Marg blocked at Bhalumare, Madi-6

Overview

Nepal Police's 11 September, 11:42 NPT bulletin reports that a dry landslide with rocks and soil fully blocked the Ghorahi-Thawang-Rukum Shahid Marg at Bhalumare, Madi-6, at about 10:15 that morning. No reopening time or vehicle exception is stated. This is a different location from Bhalkhor in Parivartan-3.

Key details

Bhalumare, Madi-6, RolpaSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · No vehicle exception statedRoad update

Blocked

Kaligandaki Corridor blocked at Rakse, Gulmi

Overview

Nepal Police's 11 September, 11:42 NPT bulletin reports that a muddy landslide fully blocked the Kaligandaki Corridor at Rakse, Kaligandaki-2, Gulmi, at about 08:20 that morning. No reopening time, confirmed diversion or vehicle exception is stated. Check the latest local traffic instructions before travel.

Key details

Rakse, Kaligandaki-2, GulmiSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road and bridge access · Ground access, including on foot, reported unavailableRoad update

Blocked

Tiru remains cut off by land; food delivered by helicopter

Overview

The Kathmandu Post's 10 September report says Tiru, Uttargaya-1, remains cut off after roads and bridges were washed away. The ward chair said even access on foot was not possible. Food was delivered by helicopter on 9 and 10 September. These deliveries do not confirm restored ground access or a public helicopter service. No reopening time or delivery schedule is stated.

Key details

Tiru, Uttargaya-1, RasuwaSource posted:

Next step

Check locally before you travel.

The Kathmandu Post, citing local officialsChecked:
View source

Bridge · Pedestrian access confirmed; further vehicle classes and weight limits not statedRoad update

Restricted

Devighat Acrow bridge open to the public; vehicle limits unstated

Overview

Nepal's 10 September, 14:00 NPT official update says the Acrow bridge over the Tadi River at Devighat is complete and open to the public. INSEC's 11 September report also describes it as operating between Devighat and Jiling. Earlier reporting confirmed pedestrian access. These newer texts do not specify permitted vehicle classes, weight limits or hours; unrestricted vehicle passage is not established. This does not confirm Betrawati bridge or the full Galchhi-Trishuli route is open.

Key details

Devighat, Tadi River crossing, NuwakotSource posted:

Next step

Check locally before you travel.

Ministry of Foreign Affairs; INSECChecked:
View source

Road · Public and private vehicles; essential services exemptRoad update

Restricted

Tokha-Chhahare road at Ghattekhola, Shivapuri-8

Overview

The Nepal Police road notice current to 18:00 NPT on 2 September still restricts public and private vehicles on the Tokha-Chhahare road from 22:00 to 05:00. Essential services are exempt. A separate 2 September report places the control at Ghattekhola in Shivapuri-8. The official notice does not state daytime vehicle limits.

Key details

Nuwakot, Ghattekhola, Shivapuri Rural Municipality-8, Tokha-Chhahare roadSource posted:

Next step

Check locally before you travel.

Nepal Police; exact point reported by Nepal NewsChecked:
View source

RoadRoad update

Restricted

Sopyang Khola reopens one-way from 08:15

Overview

Police's 10 September, 09:34 NPT bulletin confirms one-way traffic at Sopyang Khola from 08:15. Vehicle limits and full reopening time are not stated.

Key details

Sopyang Khola, Thakre-7, DhadingSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · No vehicle exception statedRoad update

Blocked

Bheri Corridor blocked at Galgaitha

Overview

Police report the Bheri Corridor fully blocked at Galgaitha, Aathbiskot-6, after a landslide with fallen trees at 22:00 NPT on 9 September. No reopening time is given.

Key details

Galgaitha, Aathbiskot-6, Rukum WestSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · No exception statedRoad update

Blocked

Nagma-Gamgadhi road blocked at Talcha, Mugu

Overview

Nepal Police's 9 September, 10:12 am bulletin still lists the Nagma-Gamgadhi road at Talcha, Chhayanath Rara-4, Mugu as fully blocked by debris. No reopening time or vehicle exception is stated. This is the bulletin's update time, not a new landslide observation.

Key details

Talcha, Chhayanath Rara-4, Mugu, Nagma-Gamgadhi roadSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · No exception statedRoad update

Blocked

Shahid Highway blocked at Bhalkhor, Rolpa

Overview

Nepal Police's 9 September, 10:12 am bulletin still lists Shahid Highway at Bhalkhor, Parivartan-3, Rolpa as fully blocked. No reopening time, confirmed diversion or vehicle exception is stated. The bulletin update does not establish a new landslide date.

Key details

Bhalkhor, Parivartan-3, Rolpa, Shahid HighwaySource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · One-way movementRoad update

Restricted

Chisapani road section at Chandragiri-2

Overview

Khabarhub's 9 September report says Chisapani at Chandragiri-2 remains restricted to one-way movement after a landslide. Vehicle class and heavy-vehicle eligibility are not stated. This is a section-level report, not confirmation that the entire Kathmandu-Dhading route is passable.

Key details

Chisapani, Chandragiri-2, Kathmandu, on the Kathmandu-Dhading approachSource posted:

Next step

Check locally before you travel.

Khabarhub road-status reportChecked:
View source

Bridge · Trekkers and pedestrians; motor-vehicle access and load limits not statedRoad update

Verification Expired

Manaslu and Larke Pass: historical 9 September notice

Overview

Historical notice, not current access permission: Gorkha administration's 9 September 2026 notice allowed Manaslu and Larke Pass trekking to resume with precautions after repairs. That notice does not establish present passability after the 11 October flood. Confirm the specific trail section with local authorities before travel. This record does not establish that every upper trail is closed, nor does it confirm motor-vehicle access.

Key details

Namrung, Chumnubri, Gorkha; Manaslu and Larke Pass trekking routesSource posted:

Next step

Check locally before you travel.

District Administration Office, GorkhaChecked:
View source

RoadRoad update

Blocked

Ghandruk road remains blocked around Birethanti

Overview

OnlineKhabar's 8 September, 8:52 pm report, citing police, says the road to Ghandruk is still blocked after flood erosion around Birethanti. The report dates the earlier road damage to 18 August and says full operation has not resumed. This is a continuing road disruption, not proof that all Annapurna trails are closed. A reopening time, vehicle detour and exact obstruction endpoints were not stated.

Key details

Road towards Ghandruk through the Birethanti area, Annapurna Rural Municipality, KaskiSource posted:

Next step

Check locally before you travel.

OnlineKhabar, citing Kaski PoliceChecked:
View source

RoadRoad update

Restricted

Alternative road to Trishuli Bazaar via Kalleritar and Gauribesi

Overview

NDRRMA's 8 September, 7 pm report says the Trishuli right-bank road is operating while repairs continue. It runs from Galchhi across the Trishuli bridge via Kalleritar, Koshikhola, Pimaltar, Darshantar, Chhatre Khola and Gauribesi to Trishuli Bazaar. Vehicle classes, weight limits and opening hours are not stated. This is not confirmation of unrestricted or safe travel for every vehicle.

Key details

Kalleritar–Koshikhola–Pipaltar–Darshantar–Chhatrekhola–Gauribesi–Trishuli Bazaar corridor, NuwakotSource posted:

Next step

Check locally before you travel.

NDRRMA SitRep 08, 8 September 2026 19:00 NPTChecked:
View source

Road · Four-wheel vehicles: 3 September report onlyRoad update

Restricted

Pipaltar-Kolputar alternative road

Overview

NDRRMA's 8 September, 19:00 NPT report described the Pipaltar-Dhamle-Niranjana-Bagkhor-Harre-Deurali-Kolputar alternative as operating with repairs ongoing. A 3 September report described a 35 km route for four-wheel vehicles; no newer vehicle or weight limit for this alternative was verified. Separately, the ministry's 10 September bulletin says Devighat's Acrow bridge is complete and open to the public. That bridge update does not establish heavy-truck access on this alternative or the full corridor.

Key details

Pipaltar-Dhamale-Niranjana-Baghkhor-Harre-Deurali-Kolputar, NuwakotSource posted:

Next step

Check locally before you travel.

NDRRMA SitRep 08, 8 September 2026 19:00 NPTChecked:
View source

RoadRoad update

Restricted

One-way traffic at Shital Bazar

Overview

NDRRMA's 8 September, 7 pm report says Shital Bazar on the Prithvi Highway is operating for one-way traffic after the road caved in. Vehicle classes, weight limits and traffic-control hours are not stated. Follow local traffic controls. This section update does not mean the full Prithvi Highway is open.

Key details

Not stated, Shital Bazar, Prithvi Highway, Mugling-Malekhu sectionSource posted:

Next step

Check locally before you travel.

NDRRMA SitRep 08, 8 September 2026 19:00 NPTChecked:
View source

RoadRoad update

Restricted

Dhikure-Bogatitar alternative: reopening not confirmed

Overview

NDRRMA's 8 September, 7 pm report says repairs continue on the Dhikure-Phedi Besi Chowk-Hiramunitar-Chogte-Bore Bhanjyang-Sano Khola-Dhanswara-Bhorle-Jibjibe-Bogatitar alternative. Preparations to resume traffic are underway; reopening is not confirmed. This is a separate branch from the Bahunbesi-Lachyang-Parchyang-Dhunche route. Do not treat that route's operating notice as permission to use this one.

Key details

Dhikure, Nuwakot, via Bhorle and Jibjibe to Bogatitar, RasuwaSource posted:

Next step

Check locally before you travel.

NDRRMA SitRep 08, 8 September 2026 19:00 NPTChecked:
View source

RoadRoad update

Restricted

Official update on Bidur-Chogate-Lachyang-Dhunche route

Overview

Nuwakot's 8 September, 6 pm bulletin lists Bidur-Chogate-Borebhanjyang-Lachyang-Zero Kilometre-Dhunche as operating. Rasuwa's 5 September notice imposes daily repair stops at Chogate and other control points from 07:00 to 11:00 and 14:00 to 17:00, starting 6 September until further notice. This shares parts of the already-listed Dhunche alternatives; a separate non-overlapping segment has not been established. Vehicle classes and weight limits for this branch are not stated.

Key details

Nuwakot, Bidur-Chogate-Borebhanjyang-Lachyang-Zero Kilometre-DhuncheSource posted:

Next step

Check locally before you travel.

District Administration Office, NuwakotChecked:
View source

RoadRoad update

Blocked

Chorkhola: earlier 8 September official closure report

Overview

Earlier official report: Nepal Police's 8 September, 10 am bulletin listed Rapti Highway at Chorkhola, Kapurkot-3, Salyan as blocked after the 7 September landslide. The 9 September, 10:12 am bulletin gives no update for this exact point. Omission does not confirm reopening. Current vehicle access and a safe diversion remain unverified.

Key details

Chorkhola, Kapurkot-3, SalyanSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Blocked

Aulise: earlier 8 September official closure report

Overview

Earlier official report: Nepal Police's 8 September, 10 am bulletin listed Karnali Highway at Aulise, Barahatal-7, Surkhet as blocked after the 6 September landslide. The 9 September, 10:12 am bulletin gives no update for this exact point. Its absence does not confirm reopening. No current site-specific vehicle access or diversion was verified.

Key details

Aulise, Barahatal-7, SurkhetSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Blocked

Mahakali Highway blocked at Bitakam, Baitadi

Overview

Nepal News reported on 8 September that a landslide and falling rocks blocked the Mahakali Highway at Bitakam, Dogadakedar-5, Baitadi. Police said bulldozers were being used to clear the road. The report did not give a reopening time or confirm an alternative route. Clearance work is not confirmation that vehicles can pass.

Key details

Bitakam, Dogadakedar-5, BaitadiSource posted:

Next step

Check locally before you travel.

Nepal News, citing district policeChecked:
View source

RoadRoad update

Blocked

Kabhra-Kalimati road blocked by rockfall at Dalpure

Overview

Gorkhapatra reported on 7 September that continuing rockfall at Dalpure, Kalimati-1, Salyan, had fully blocked the Kabhra-Kalimati road toward Tulsipur since the previous night. Falling rocks were preventing machinery from reaching the site. No reopening time or confirmed diversion was announced.

Key details

Dalpure, Kalimati-1, Salyan; Kabhra-Kalimati road toward TulsipurSource posted:

Next step

Check locally before you travel.

GorkhapatraChecked:
View source

Road · single-lane rough roadRoad update

Blocked

Pasang Lhamu road: Trishuli–Betrawati–Mailung–Syabrubesi–Rasuwagadhi

Overview

BIPAD's latest highway record still marks NH42 from Galchhi through Trishuli, Betrawati, Mailung and Syabrubesi to Rasuwagadhi as closed. It says flooding swept away the river-route road. The same record's timing fields conflict, so do not use them to predict when the road will reopen. Check the latest official road notice before travel.

Key details

Khaltei, Uttargaya-5 and the Pasang Lhamu corridor to RasuwagadhiSource posted:

Next step

Check locally before you travel.

BIPADChecked:
View source

RoadRoad update

Blocked

Bhukaha Khola: earlier 5 September closure report

Overview

Earlier report: Nepal News on 5 September said the Karnali Corridor at Bhukaha Khola, Jagannath-5, Bajura was blocked. The separate Bandhu section had been cleared. No later site-specific reopening was verified in this review. This dated report is not a fresh field check and does not establish passage along the whole corridor.

Key details

Bhukaha Khola, Jagannath-5, Bajura, Karnali CorridorSource posted:

Next step

Check locally before you travel.

Nepal NewsChecked:
View source

Road · Small vehicles on Bahunebesi-Lachyang-Parchyang-DhuncheRoad update

Earlier report

Dhunche alternatives: daily repair closures from 6 September

Overview

Rasuwa's 5 September notice stops traffic on the Dhunche alternatives at Parchyang, Bahunbesi and Chogate daily from 07:00 to 11:00 and 14:00 to 17:00 Nepal time, starting 6 September until further notice. This adds repair closures to the earlier small-vehicle report for Bahunbesi-Lachyang-Parchyang-Dhunche. It does not establish truck access, unrestricted travel or opening of the separate Dhikure-Bogatitar continuation.

Key details

Rasuwa, Bahunebesi-Lachyang-Parchyang-Dhunche; separate Dhikure-Bogatitar routeSource posted:

Next step

Check locally before you travel.

District Administration Office, Rasuwa; earlier Nuwakot reportChecked: Replaced by a newer report
View source

Road · Single-lane dirt route; heavy-vehicle eligibility not statedRoad update

Restricted

Single-lane alternative to Syabrubesi via Tokha and Dhunche

Overview

The single-lane dirt alternative to Syabrubesi via Tokha, Chhahare, Bidur, Lachyang and Dhunche now has daily repair stops at Parchyang, Bahunbesi and Chogate: 07:00-11:00 and 14:00-17:00 Nepal time from 6 September until further notice, under Rasuwa's 5 September notice. The separate Tokha-Chhahare 22:00-05:00 restriction remains, except essential services. Heavy-vehicle eligibility is not stated; follow local traffic control.

Key details

Rasuwa, Kathmandu-Tokha-Chhahare-Bidur-Lachyang-Dhunche-Syabrubesi alternativeSource posted:

Next step

Check locally before you travel.

District Administration Office, Rasuwa; Nepal PoliceChecked:
View source

Road · 4x4Road update

Restricted

Road report for travel to Kalika wards 1, 2 and 3

Overview

A returning field team member reported very poor road conditions when asked about travel to Kalika wards 1, 2 and 3, Rasuwa. Their advice: • Use a 4WD vehicle only. • Carry good torches. • Wear boots, not casual shoes. • Take some chocolate with you. This is a field report, not confirmation that the route is safe or open. Check the latest road conditions with the local team before leaving.

Key details

Kalika wards 1, 2 and 3, RasuwaSource posted:

Next step

Check locally before you travel.

Nepal Flood Relief Network first-responder groupChecked:

Road · All vehicle passage reported blockedRoad update

Blocked

Khalte and Trishuli-Mailung-Syaphrubesi road closed

Overview

The 3 September police road update reports that the road at Khalte and the Trishuli-Mailung-Syaphrubesi corridor remain fully closed. The closure may be prolonged. Do not attempt travel based only on this listing; confirm the latest condition with Traffic Police 103 or a recent local authority update.

Key details

Rasuwa, Khalte and Trishuli-Mailung-Syaphrubesi corridorSource posted:

Next step

Check locally before you travel.

Nepal Police, reported by Nepal NewsChecked:
View source

Road · All vehicle passage reported blockedRoad update

Blocked

Pasang Lhamu Highway closed at Simtar, Belkotgadhi-10

Overview

The 3 September police road update reports that the Pasang Lhamu Highway is fully closed at Simtar in Belkotgadhi-10, Nuwakot. Do not infer that nearby roads are open. Confirm current passage with Traffic Police 103 or local authorities before travel.

Key details

Nuwakot, Simtar, Belkotgadhi-10, Pasang Lhamu HighwaySource posted:

Next step

Check locally before you travel.

Nepal Police, reported by Nepal NewsChecked:
View source

Road · Public and private vehicles; official exemptions may applyRoad update

Restricted

Tokha-Chhahare road closed nightly from 10 PM to 5 AM

Overview

The Tokha-Chhahare road at Ghattekhola, Shivapuri-8 remains closed each night from 10:00 PM to 5:00 AM. The daily 5:00 AM reopening does not mean the recurring restriction has ended. Confirm current conditions with Traffic Police 103 before travel.

Key details

Nuwakot, Ghattekhola, Shivapuri-8, Tokha-Chhahare roadSource posted:

Next step

Check locally before you travel.

Nepal Police, reported by Nepal NewsChecked:
View source

Road · Freight vehicles up to 10 tonnes at night; other vehicles daytime, subject to weatherRoad update

Restricted

BP Highway operating under time and weight restrictions

Overview

The 3 September road update reports that freight vehicles up to 10 tonnes may use the BP Highway from 7:00 PM to 5:00 AM, while other vehicles may travel from 4:00 AM to 6:00 PM, subject to weather and local controls. This is a restricted transport window, not a guarantee that the full route is safe. Call Traffic Police 103 before travel.

Key details

Not stated, BP HighwaySource posted:

Next step

Check locally before you travel.

Nepal Police, reported by Nepal NewsChecked:
View source

Temporary crossing · People only; no vehicle access reportedRoad update

Restricted

Temporary cable crossing over the Trishuli River in Bidur

Overview

AP reported that the military helped establish a temporary steel-cable or zipline crossing over the Trishuli River in Bidur for people to cross. It is not a vehicle crossing. Public operating hours, exact entrance, carrying capacity and current availability were not stated. Confirm locally before attempting to use it.

Key details

Nuwakot, Temporary cable crossing over the Trishuli River in BidurSource posted:

Next step

Check locally before you travel.

Associated PressChecked:
View source

Road · One-way movement; heavy-vehicle eligibility not statedRoad update

Restricted

Jwadkhola road section

Overview

A 3 September road-status report lists one-way traffic at Jwadkhola in Dhading. The report does not state which heavy vehicles can pass. Confirm conditions with Traffic Police 103 before travel.

Key details

Jwadkhola, DhadingSource posted:

Next step

Check locally before you travel.

Nepal Police road status reported by Nepal NewsChecked:
View source

Road · No vehicles reported able to passRoad update

Blocked

Khalte and Trishuli-Mailung-Syafrubesi corridor

Overview

A 3 September road-status report says the Khalte section and the Trishuli-Mailung-Syafrubesi route remain fully closed in Rasuwa. The report describes the disruption as potentially long-lasting. Do not assume an unreported alternative is safe; call Traffic Police 103 and confirm locally before dispatch.

Key details

Khalte and Trishuli-Mailung-Syafrubesi corridor, RasuwaSource posted:

Next step

Check locally before you travel.

Nepal Police road status reported by Nepal NewsChecked:
View source

Road · No vehicles reported able to passRoad update

Blocked

Pasang Lhamu Highway at Simtar

Overview

A 3 September road-status report says the Pasang Lhamu Highway remains fully closed at Simtar in Belkotgadhi-10, Nuwakot. Call Traffic Police 103 and confirm locally before dispatching vehicles or supplies.

Key details

Simtar, Belkotgadhi-10, NuwakotSource posted:

Next step

Check locally before you travel.

Nepal Police road status reported by Nepal NewsChecked:
View source

Road · Closed daily 22:00-05:00; check other vehicle restrictions locallyRoad update

Restricted

Tokha-Chhahare road at Ghattekhola

Overview

The 3 September road-status report says the Tokha-Chhahare road at Ghattekhola remains closed every night from 10:00 PM to 5:00 AM. The morning end of each daily closure does not mean the restriction has permanently ended. Call Traffic Police 103 before travel.

Key details

Ghattekhola, Tokha-Chhahare road, NuwakotSource posted:

Next step

Check locally before you travel.

Nepal Police road status reported by Nepal NewsChecked:
View source

Road · Official notice lists the road as fully blockedRoad update

Blocked

Prithvi Highway at Parewa Bhir, Gajuri-3

Overview

Earlier report: Nepal Police listed Parewa Bhir as fully blocked at 9:30 pm on 2 September. This is historical, not the present restriction. The current Parewa Bhir card has the separate 5 September daytime repair closure. Do not use this older record to determine current passage.

Key details

Parewa Bhir, Gajuri-3, DhadingSource posted:

Next step

Check locally before you travel.

Nepal Police; OnlineKhabarChecked:
View source

RoadRoad update

Blocked

Prithvi Highway at Krishna Bhir, Benighat Rorang-7

Overview

BIPAD highway record 310, modified at 19:45 NPT on 2 September, still lists the Prithvi Highway at Benighat Rorang-7 as CLOSED. BIPAD estimates 17:00 on 10 September for the roadblock end, but this estimate can change.

Key details

Krishna Bhir, Benighat Rorang-7, DhadingSource posted:

Next step

Check locally before you travel.

BIPAD and Benighat Rorang Rural MunicipalityChecked:
View source

Road · Tunnel: all outbound vehicles except petroleum carriers and two-wheelers. Affected road: petroleum carriers and two-wheelers under one-way control.Road update

Restricted

Nagdhunga-Naubise road at Patleban

Overview

A three-metre section of the Nagdhunga-Naubise road sank at Patleban on 2 September. Small vehicles are being diverted through the Nagdhunga Tunnel. A Department of Roads update said the tunnel is open to vehicles leaving Kathmandu for Muglin except petroleum carriers and two-wheelers. Those vehicles are using the affected road under one-way control. Follow newer police or road instructions if this changes.

Key details

Patleban (also reported as Pataleban), Nagdhunga-Naubise road, DhadingSource posted:

Next step

Check locally before you travel.

Department of Roads, reported by Fiscal NepalChecked:
View source

Road · All traffic blockedRoad update

Blocked

Bidur-Lachyang road at Lachyang Danda, Suryagadhi-1

Overview

The current Nepal Police road notice reports the Bidur to Lachyang road blocked by a landslide at Lachyang Danda in Suryagadhi-1, Nuwakot, recorded at 03:50 NPT on 2 September. Traffic is blocked. No reopening time or vehicle exception is stated.

Key details

Lachyang Danda, Suryagadhi-1, NuwakotSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · Small passenger vehicles with fewer than 14 seats; travel only if neededRoad update

Restricted

Kathmandu to Hetauda small-vehicle diversion

Overview

Nepal Police's road notice, current to 5:30 AM on 7 September, says small passenger vehicles with fewer than 14 seats may travel from Kathmandu to Hetauda via Pharping, Phakhel, Kulekhani and Bhimphedi. This is a traffic plan, not a guarantee that every section is safe. Travel only if needed and follow police instructions.

Key details

Makwanpur, Kathmandu to Hetauda, Makawanpur, via Pharping, Phakhel, Kulekhani and BhimphediSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · Small passenger vehicles with fewer than 14 seats; travel only if neededRoad update

Restricted

Hetauda to Kathmandu small-vehicle diversion

Overview

Nepal Police's road notice, current to 5:30 AM on 7 September, says small passenger vehicles with fewer than 14 seats may travel from Hetauda to Kathmandu via Bhimphedi, Kulekhani, Sisneri and Dakshinkali. This is a traffic plan, not a guarantee that every section is safe. Travel only if needed and follow police instructions.

Key details

Makwanpur, Hetauda, Makawanpur, to Kathmandu via Bhimphedi, Kulekhani, Sisneri and DakshinkaliSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Bridge · No fuel tankers or heavy freight vehicles on the Bailey bridge; use the adjacent diversion and call Traffic Police 103Road update

Restricted

Bailey bridge near Trikhandi

Overview

The most recent route plan found instructs fuel tankers and heavy freight vehicles not to use the Bailey bridge near Trikhandi because of its limited load capacity; those vehicles should use the adjacent diversion. A 3 September police status report confirms alternative routing remains necessary while Krishnabhir is blocked. Call Traffic Police 103 before travel and follow on-site instructions.

Key details

Makwanpur, Bailey bridge near Trikhandi, MakawanpurSource posted:

Next step

Check locally before you travel.

Kathmandu Valley Traffic Police route plan, reported by Nepal NewsChecked:
View source

Bridge crossings · Affected bridge crossings are blocked or damaged; no passage confirmedRoad update

Blocked

Major bridge damage across Dhading

Overview

Ratopati reported on 2 September, citing the District Administration Office Dhading, that floods washed away 16 suspension bridges and completely damaged 7 concrete bridges in Dhading. Another 7 suspension bridges were partly damaged. Affected crossings are in Galchhi, Gajuri and Benighat Rorang. Several Galchhi crossings that link Dhading and Nuwakot were lost. The Kalikasthan to Majhitar suspension bridge was also washed away. Do not assume nearby crossings are open.

Key details

Dhading, Suspension and concrete bridge crossings in Galchhi, Gajuri and Benighat RorangSource posted:

Next step

Check locally before you travel.

Ratopati citing District Administration Office DhadingChecked:
View source

RoadRoad update

Open

Colony-Budhisinghghat road

Overview

A Nuwakot District Administration Office update reported the Colony-Budhisinghghat road operational as of 10:00 AM on 1 September. Vehicle type, weight limits and direction were not stated. This report does not guarantee the road is safe in changing weather.

Key details

Nuwakot, Colony-Budhisinghghat roadSource posted:

Next step

Check locally before you travel.

OnlineKhabar citing District Administration Office, NuwakotChecked:
View source
An excavator and field workers beside a narrow, muddy mountain road.

Road · 4WD only advisedRoad update

Restricted

Kathmandu–Tokha–Chhahare–Dhunche route

Overview

A field team travelling toward Dhunche shared a new 11-second video. It shows an excavator working beside a narrow, rough road. The exact segment and whether vehicles can pass now were not stated. The team's earlier advice remains: use 4WD only, allow extra time and expect sudden blockage. Confirm the route before travel.

Key details

Kathmandu–Tokha–Chhahare–Dhunche route, RasuwaSource posted:

Next step

Check locally before you travel.

First responder WhatsApp groupChecked:

RoadRoad update

Restricted

Mastar to Dhadingbesi alternative road

Overview

Department of Roads said an alternative road connection to Dhadingbesi is operating from Mastar through Nepaltar, Gajuritar, Pipaltar, Adamtar and Benighat. The main route remains damaged at Krishnabhir and Parewadanda, and the Furkekhola bridge has collapsed. The source did not state which vehicle classes can use the route. This is not a guarantee that the route is safe.

Key details

Mastar, Nepaltar, Gajuritar, Pipaltar, Adamtar, Benighat and DhadingbesiSource posted:

Next step

Check locally before you travel.

Artha Khabar citing Department of RoadsChecked:
View source

RoadRoad update

Open

Mastar-Trishuli right bank-Gajuritara-Dhadingbesi alternative route

Overview

Ratopati reported at 16:47 NPT that the alternative road from Mastar along the right bank of the Trishuli through Gajuritara to Dhadingbesi was operating. The report said the route uses bridges at Mastar and Galchhi that remained usable. Vehicle class, weight limits and direction were not stated.

Key details

Mastar, the right bank of the Trishuli, Gajuritara and DhadingbesiSource posted:

Next step

Check locally before you travel.

Ratopati citing Road Division NuwakotChecked:
View source

RoadRoad update

Restricted

Syabrubesi and Thulo Syabrubesi roads

Overview

A trusted WhatsApp group update says Syabrubesi and Thulo Syabrubesi have road connectivity problems. The sender said a local person believed heavy equipment might clear the problem in about one day. Check locally before travel.

Key details

Syabrubesi and Thulo Syabrubesi, RasuwaSource posted:

Next step

Check locally before you travel.

First responder WhatsApp groupChecked:

RoadRoad update

Earlier report

Trishuli-side Galchi–Syabrubesi and Muglin–Narayanghat corridors

Overview

An earlier Nepal Police notice current to 11:00 NPT reported one-way traffic on broad Trishuli-side sections of the Galchi-Syabrubesi and Muglin-Narayanghat corridors. The newer 11:42 notice no longer includes that broad statement and instead lists exact blocked segments. Do not rely on this earlier corridor-wide report for current travel.

Key details

Rasuwa, Galchi–Syabrubesi and Muglin–Narayanghat corridors near the Trishuli RiverSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source
Muddy road near Pung Khola bridge on the way to Rasuwa.

Road · Not confirmedRoad update

Restricted

Road near Pung Khola bridge

Overview

A first responder shared a video showing a muddy, badly damaged road about five minutes from Pung Khola bridge on the way to Rasuwa. This does not confirm the condition of the full route. Check again before travel.

Key details

Near Pung Khola bridge, road to RasuwaSource posted:

Next step

Check locally before you travel.

First responder WhatsApp groupChecked:

Road · Unknown; weight, width and vehicle class not confirmedRoad update

Check again

Galchi bridge area

Overview

A photo report published at 12:49 NPT says a bridge in Galchi is being used by travellers and relief teams. The bridge name, road-authority inspection, approach roads and vehicle limits are not confirmed. Do not treat this as proof that the bridge is safe.

Key details

Dhading, Galchi bridge access point (exact bridge identity unconfirmed)Source posted:

Next step

Check locally before you travel.

OnlineKhabarChecked:
View source

River crossing · No usable crossing reportedRoad update

Blocked

Betrawati–Ratmate Trishuli River crossings

Overview

A verified field report says no usable crossing to the Trishuli far side was available, cutting off parts of Nuwakot and Rasuwa; supplies were reportedly accumulating in Bidur. It calls for 3–5 rapid crossings between Betrawati and Ratmate.

Key details

NuwakotSource posted:

Next step

Check locally before you travel.

Arjun Narasingha Kc (@ArjunNarasingha)Checked:
View source

Road · Public and private vehicles; essential services exemptRoad update

Earlier report

Tokha–Chhahare road

Overview

Earlier update. At 7:27 AM, the Nepal Police notice was still online but had no new details. The Tokha–Chhahare night closure ended at 5:00 AM. The road has not been checked again, so do not assume it is open or blocked now.

Key details

NuwakotSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked: Replaced by a newer report
View source

Road · Vehicle type not confirmedRoad update

Verification Expired

Pasang Lhamu Highway corridor

Overview

Earlier update. At 7:27 AM, BIPAD still showed NH42-014 at Gosaikunda-5 as closed. The field report is from 26 August. The road and suitable vehicle type have not been checked again.

Key details

RasuwaSource posted:

Next step

Check locally before you travel.

Nepal Police; Department of Roads via BIPADChecked:
View source

Road · Vehicle type not confirmed; Police said the area was not passable on footRoad update

Verification Expired

Prithvi Highway at Krishna Bhir, Parewa Bhir and Benighat

Overview

Earlier update. At 7:27 AM, BIPAD still showed NH17-003 at Benighat Rorang-7 as closed. The field report began at 8:10 AM on 30 August. The road and suitable vehicle type have not been checked again.

Key details

DhadingSource posted:

Next step

Check locally before you travel.

Nepal Police; Department of Roads via BIPADChecked:
View source

Road · UnknownRoad update

Verification Expired

A Nepal media account reports the Ghyalchok–Charaudi suspension bridge was swept away, but the capture time and current condition are not established

Overview

A Nepal media account reports the Ghyalchok–Charaudi suspension bridge was swept away, but the capture time and current condition are not established.

Key details

Dhading (reportedSource posted:

Next step

Check locally before you travel.

Nepal media Instagram postChecked:
View source

Suspension bridge · Pedestrians and local farm-market usersRoad update

Blocked

Ghyalchowk–Charaudi suspension bridge

Overview

The bridge loss removes an alternative pedestrian and farm-market connection between Gorkha and the Charaudi side of Dhading.

Key details

DhadingSeen at:

Next step

Check locally before you travel.

Radio NepalChecked:
View source

RoadEarlier damage

Earlier report

Prithvi Highway at Krishna Bhir

Overview

The Department of Roads recorded NH17-003 at Benighat Rorang-7 as closed after a landslide at 08:10 NPT on 30 August. Earlier report.

Key details

Dhading, Krishna Bhir, Benighat Rorang-7Seen at:

Next step

Check locally before you travel.

Department of Roads, Government of NepalChecked: Replaced by a newer report
View source

Relief centre · Not confirmedRelief point

Reported point

Reported relief and shelter centres in Rasuwa

Overview

Ten relief or shelter centres were reported in Rasuwa. Named areas include Dadagaun, Haku, Pangling, Gre and four Uttargaya centres: Shivalaya, Shantibazar, Bhimsensthan and Kalika. Check the exact centre and what it can receive before delivery.

Key details

Rasuwa relief centresSource posted:

Next step

Check locally before you travel.

OnlineKhabarChecked:
View source

Relief centre · Not confirmedRelief point

Reported point

Reported relief and shelter centres in Nuwakot

Overview

Sixteen relief or shelter centres were reported in Nuwakot, holding 2,274 people at the time of the report. Exact locations, current numbers and what each centre can receive still need confirmation.

Key details

Nuwakot relief centresSource posted:

Next step

Check locally before you travel.

OnlineKhabarChecked:
View source

BridgeEarlier damage

Earlier report

Rasuwa bridge damage history

Overview

Multiple bridges in Rasuwa were reported swept away or damaged. This history layer does not say every crossing is still closed. Use current Access reports before travel.

Key details

Rasuwa, Bhotekoshi and Trishuli corridorsSource posted:

Next step

Check locally before you travel.

OnlineKhabarChecked: Earlier information
View source

BridgeEarlier damage

Earlier report

Dhading bridge damage history

Overview

Bridge damage was reported in Dhading during the flood response. This card keeps the damage history visible but does not mark any unnamed road closed. Check current Access reports before travel.

Key details

Flood-affected crossings in DhadingSource posted:

Next step

Check locally before you travel.

OnlineKhabarChecked: Earlier information
View source

Showing 96 of 101

Load moreShow fewer