Road and bridge updates

See recent road, bridge, and relief-point updates.

An unmarked road may still be unsafe or closed.Check locally before travel.
6 of 27 updates are on the mapGrey points are earlier reports. Check the time before travel.

Latest road and bridge reports27

Road · Not specified by policeRoad update

Open for stated vehicle class

Galaundi Prithvi Highway reopened at 06:10 NPT

Overview

Nepal Police's 13 October 2026, 06:35 NPT notice reports that the Prithvi Highway at Galaundi, Gajuri-5, Dhading, reopened at 06:10 NPT after overnight road repairs. This replaces the earlier scheduled full-closure notice. Vehicle classes, weight limits and lane arrangements are not specified. The reopening applies to this named section, not every road in Dhading.

Key details

Dhading, Galaundi (Galaudi), Gajuri-5Source posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · Freight: maximum 10 wheels and 15 tonnes, except fuel/LPG carriers; passenger vehicle length maximum 11 mRoad update

Restricted

Tribhuvan Highway: 10–11 October traffic windows and vehicle limits

Overview

Nepal Police's 10 October 2026, 17:15 NPT bulletin sets directional traffic windows on Tribhuvan Highway. Kathmandu to Hetauda: 10 October 09:00–12:00 and 22:00–01:00 on 11 October; 11 October 14:00–19:00. Hetauda to Kathmandu: 10 October 02:00–05:00 and 15:00–18:00; 11 October 04:00–10:00. All times are Nepal time. Until further arrangements, freight vehicles with more than 10 wheels or loads above 15 tonnes are barred, except vehicles carrying fuel or LPG. Passenger vehicles must be no longer than 11 metres. These are traffic-control windows, not a guarantee of clear passage; check current police instructions before travel. Earlier 10 September one-way movement at Sopyang Khola does not establish today's condition there.

Key details

Hetauda, Makawanpur, via Naubise, Dhading, to Thankot, KathmanduSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Restricted

Prithvi Highway: one-way traffic at Krishnabhir

Overview

The Kathmandu Post's 29 September update, citing Department of Roads spokesperson Shubha Raj Neupane, reports traffic restored on Prithvi Highway, with one-way movement at Krishnabhir while work continues to restore two-way traffic. This supersedes the earlier blanket-closure report, not every local restriction. Vehicle classes and weight limits are not specified.

Key details

Krishnabhir, Tingrangkhani, Parewa Bhir and Bange Mod, DhadingSource posted:

Next step

Check locally before you travel.

The Kathmandu Post, citing Department of Roads spokespersonChecked:
View source

RoadRoad update

Restricted

Krishnabhir: one-way traffic restored

Overview

The Kathmandu Post's 29 September update, citing Department of Roads spokesperson Shubha Raj Neupane, reports traffic restored on Prithvi Highway, with one-way movement at Krishnabhir while work continues to restore two-way traffic. This supersedes the earlier blanket-closure report, not every local restriction. Vehicle classes and weight limits are not specified.

Key details

Krishnabhir, Benighat Rorang, DhadingSource posted:

Next step

Check locally before you travel.

The Kathmandu Post, citing Department of Roads spokespersonChecked:
View source

Road · All vehicles barred until further noticeRoad update

Blocked

Parewa Bhir: both directions blocked in 25 September police bulletin

Overview

Nepal Police's bulletin of 25 September 2026, 22:00 NPT, reports Prithvi Highway blocked in both directions at Krishnabhir and Tingrangkhani in Benighat Rorang, and Parewa Bhir and Bange Mod in Gajuri, following landslides with large rocks from about 23:10 NPT on 24 September. All vehicles are barred from the affected Dhading section until further notice. This supersedes the earlier reopening reports; no reopening time is confirmed. Follow official traffic instructions.

Key details

Parewa Bhir, DhadingSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Blocked

Prithvi Highway blocked at Jyamire Ghat, Dhading

Overview

Nepal Police's 18 September 2026, 15:12 NPT bulletin reports the Prithvi Highway fully blocked at Jyamire Ghat, Benighat Rorang-9, Dhading, at about 14:00 NPT because rain had made the road slippery. The morning bulletin had reported a landslide blockage at this section. No reopening time, alternative route or vehicle exception is stated. Krishnabhir's separate reopening on 17 September does not establish through-passage here.

Key details

Dhading, Jyamire Ghat, Benighat Rorang-9Source posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Restricted

Prithvi Highway: single-lane restrictions at Galchhi and Baireni

Overview

The Kathmandu Post's 17 September report says Galchhi and Baireni on the Prithvi Highway remain restricted to one lane after erosion and landslides. Krishnabhir's reopening does not mean the whole highway has unrestricted two-way traffic. Vehicle classes, weight limits and traffic-control hours at these sections are not stated. The earlier 2 September report also listed Jarikhet, Pokhare, Munge and Galaudi; their current condition is not reconfirmed by this update.

Key details

Galchhi and Baireni, DhadingSource posted:

Next step

Check locally before you travel.

The Kathmandu Post; earlier Nepal Views reportChecked:
View source

Road · Passenger and freight traffic reported; weight limits not statedRoad update

Open for stated vehicle class

Krishnabhir: two-way traffic reported from 17 September

Overview

OnlineKhabar and Kathmandu Post report that two-way traffic resumed on Krishnabhir's new track in Dhading on 17 September. OnlineKhabar cites district police confirming vehicles operating in both directions that morning, following the administration's 06:00 reopening decision. Landslide, falling-rock and road-subsidence risks remain; retaining-wall and drainage work continues. Follow on-site traffic control. The reports do not give weight limits or a complete daily operating schedule, and do not establish safe passage along every section of the highway.

Key details

Krishnabhir, Benighat Rorang, DhadingSource posted:

Next step

Check locally before you travel.

OnlineKhabar and Kathmandu PostChecked:
View source

Road · No vehicle exception statedRoad update

Blocked

Kamere Bhir: both directions blocked after new landslide

Overview

Police's 11 September, 11:42 NPT bulletin reports that a dry landslide at Kamere Bhir, Thakre-2, fully blocked both directions of the Prithvi Highway at about 04:40 that morning. This replaces the earlier one-way report for this section. No reopening time or vehicle exception is stated.

Key details

Kamere Bhir, Thakre-2, DhadingSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

RoadRoad update

Restricted

Sopyang Khola reopens one-way from 08:15

Overview

Police's 10 September, 09:34 NPT bulletin confirms one-way traffic at Sopyang Khola from 08:15. Vehicle limits and full reopening time are not stated.

Key details

Sopyang Khola, Thakre-7, DhadingSource posted:

Next step

Check locally before you travel.

Nepal PoliceChecked:
View source

Road · One-way movement; heavy-vehicle eligibility not statedRoad update

Restricted

Jwadkhola road section

Overview

A 3 September road-status report lists one-way traffic at Jwadkhola in Dhading. The report does not state which heavy vehicles can pass. Confirm conditions with Traffic Police 103 before travel.

Key details

Jwadkhola, DhadingSource posted:

Next step

Check locally before you travel.

Nepal Police road status reported by Nepal NewsChecked:
View source

Road · Official notice lists the road as fully blockedRoad update

Blocked

Prithvi Highway at Parewa Bhir, Gajuri-3

Overview

Earlier report: Nepal Police listed Parewa Bhir as fully blocked at 9:30 pm on 2 September. This is historical, not the present restriction. The current Parewa Bhir card has the separate 5 September daytime repair closure. Do not use this older record to determine current passage.

Key details

Parewa Bhir, Gajuri-3, DhadingSource posted:

Next step

Check locally before you travel.

Nepal Police; OnlineKhabarChecked:
View source

Showing 12 of 27

Load more